Infrastructure · Eastern India

HVAC Central Plant Room

Construction-issue (GFC) Revit MEP model of a central plant — four chillers, three cooling towers, 22 pumps and the full chilled, condenser and hot water piping, with ductwork, cable trays, lighting and lightning protection.

  • MEP
  • BIM
HVAC Central Plant Room
Issued for construction (GFC)2024
Sector
Infrastructure
Location
Eastern India
Year
2024
Status
Issued for construction (GFC)
Deliverables shown
0 drawings & views

Case study

Coordinated MEP model of a central HVAC plant room and its terrace cooling tower deck, issued for construction.

A central HVAC plant room serving a large public building in eastern India. Axisys built the coordinated Revit MEP model of the plant room and the terrace cooling tower deck: four chillers, three cooling towers and 22 primary and secondary pumps, with large-bore chilled water and condenser water headers, heating hot water from heat pumps and solar water heaters, domestic, soft and make-up water, drainage, exhaust ductwork, cable trays, lighting and lightning protection. The model was issued for construction, with equipment, pipe, duct and electrical schedules taken straight from it. Open the live model below to explore every element.

01

The challenge

Large-bore chilled and condenser water headers, 22 pumps and four chillers share one plant room with electrical routes and lightning protection — every system has to fit and stay maintainable.

02

What Axisys did

  • Revit MEP model of the central plant room and terrace cooling tower deck
  • Chilled water, condenser water and heating hot water piping with valves and fittings
  • Domestic, soft water, make-up, drainage and rain water piping
  • Exhaust air ductwork, air terminals and axial fans
  • Equipment placement — chillers, cooling towers, pumps, heat pumps, tanks and solar water heaters
  • Cable tray and conduit routes, lighting, power and lightning protection & earthing
  • Model-based schedules and quantities, issued as a GFC model
  • Revit
  • AutoCAD
  • DIALux
03

Outcome

A construction-issue model of nearly 3,000 elements across 57 systems, with schedules and quantities taken directly from the model.

Live BIM model

Open the model. Click anything.

The coordinated Revit model of hvac central plant room, streamed into your browser. Select any element to read its family, type, system and size, explode the systems, cut plan and section views, and run the schedules straight from the model.

Loading model…

Schedules are generated live from the model data. Click a row to highlight those elements in 3D. · Model maturity: LOD 300 · construction issue